• Marandoo Waste Fines Storage Stage 4

Marandoo Waste Fines Storage Stage 4

Marandoo Waste Fines Storage Stage 4

Category: Mining / Construction

Principal: Rio Tinto Iron Ore

Client: Brierty

Duration: 2016-2017

Location: Marandoo Mine, Pilbara Region

Project Description:

  • Win, load, haul, place and compact of 1.5 million cubic meters.
  • Bulk & detailed earthworks.
  • Relocation and management of tails waste pipelines.

Survey Scope:

ST Spatial managed bulk volume calculations and design model modifications.  ST Spatial played an integral part in managing haul circuits to achieve maximum production rates for bulk earthworks. Surveyors managed a fleet of machine control plant consisting of dozers, graders and excavators Compliance surveys, end of month quantity surveys and reporting.  ST Spatial also completed setout for bulk and detailed earthworks and piping instalment.