• The JFR (Jim) McGeough Resource Recovery Facility

The JFR (Jim) McGeough Resource Recovery Facility

The JFR (Jim) McGeough Resource Recovery Facility

Category: Government / Infrastructure

Principal: Western Metropolitan Regional Council (WMRC)

Client: Monadelphous

Duration: 2011-2012

Location: Shenton Park, Perth

Project Description:

In 2007 the WMRC entered a Waste Supply Agreement with DiCOM AWT Operations Pty Ltd to construct the world’s first DiCOM® Bioconversion Waste Processing System at the Facility. The finished system will consist of three processing vessels, two water storage tanks, a materials recovery building, power generation equipment and a waste receival and loading area.

Survey Scope:

ST Spatial was engaged in the initial stages of the project, right through to the as-built sign off. ST Spatial was responsible for the placement of all bolts on site positioned to a tolerance not exceeding 3mm, positioning of all concrete footings, pedestals, suspended slabs, dimensional control for the correct positioning and alignment of steelwork, tanks, pipework, and machine assemblies on site.