Category: Government / Infrastructure, Power Infrastructure
Principal: Alinta Energy
Duration: 2016 – 2017
Location: Emu Downs – 180km North of Perth
Project Description:
The Emu Downs Solar Farm (EDSF) features 75,000 photovoltaic panels spread across 70 hectares on a site adjacent to the wind farm, 200 kilometres north of Perth and 30 kilometres west of Cervantes. The $50 million project has been operational since December 2017, when it was finished three weeks ahead of schedule.
Survey Scope:
ST Spatial was engaged to complete initial contour and feature survey of the area for design through to the survey setout of property boundaries, site compounds, clearing permits, underground services, earthworks, roadworks and piling for the solar panels arrays. ST Spatial were also responsible for all the as constructed drawings for the entire infrastructure on site.