Category: Government / Infrastructure
Principal: Water Corporation
Client: Cobey
Duration: 2016 – 2017
Location: Harris Dam - 160km South of Perth
Project Description:
The Harris Pumpback links the Harris Dam with the Stirling catchment area, and allows the transfer of excess water.
Survey Scope:
ST Spatial was engaged by Cobey to complete the survey setout for the pipeline, clearing area extents and the as-constructed drawing for the pipework installed on site to Water Corporation standards.