Category: Power Infrastructure
Principal: Synergy
Client: G
Duration: 2022-2023
Location: Kwinana
Project Description:
ST Spatial was the Principal Surveyor providing all Surveying Services on Synergy’s new 200MWh Kwinana Battery Energy Storage System (BESS). With a site area larger than 20 tennis courts and capacity to power the equivalent of 160,000 homes for two hours, the Kwinana BESS Project will be the first major grid-connected battery energy storage system in Western Australia – and is a major step in facilitating the grid integration of renewables for a cleaner future as part of the Energy Transformation Strategy.
Survey Scope:
Throughout the entire project, ST Spatial played a crucial role from inception to the final sign-off. Our responsibilities included the placement of all concrete footings, pedestals, thousands of bolts, steelwork, and substation components, as well as conducting as-constructed surveys of all infrastructure constructed on the site.